Thursday, April 7, 2011

The New and Improved Electric Orange Part 3 All Moved In

The Control Room.
The Expanded Live Room.
Isolation Booth

The New and Improved Electric Orange Part 2 Remodel

Tommy and Lucas Began the Remodel by Ripping all the Gross Tile and Concrete Up (This was Not Fun for Them).  Jon Then Started Ripping All the Walls Down to Expand the Live Room.
This Last Piece of Wall was Removed By Knocking the Support Beams out From Underneath Using a Crow Bar Like a Baseball Bat. The Whole Thing Ripped Right Out of the Ceiling!
Demolition was Fun for Jon.
Our Massive Pile of Wreckage. BTW There were a Bunch of Pieces of Broken Glass in that Pile.
 The Control Room After All the Tile and Concrete Was Cleaned Up.
 After the Wreckage was Removed and Walls Were Painted We Decided to Create A Storage Closet Next to the Bathroom.
We Reinforced The Wall to the Adjacent Suite With (2) Layers of Dry Wall and Green Glue on Top of the Existing Dry Wall.  Green Glue is VERY Messy.
The Control Room After the Walls Were Painted and Wood Floor was Put In.  

The New and Improved Electric Orange Part 1 Before

New Studio Space Before We Remodeled
The Back Room
 The Control Room
 The Hallway thats Going to be Demolished
 The Isolation Booth
The Main Studio Room that is Going to be Enlarged